The Matrix One

Tu Liem Ward, Hanoi · Open in Google Maps

No homes listed right now

The Matrix One — photo 1
The Matrix One — photo 2
The Matrix One — photo 3
The Matrix One — photo 4
1/4

The high-rise apartment complex at the intersection of Le Quang Dao Extended and Me Tri, developed by MIK Group, is located approximately 1 km from My Dinh Stadium.

Location
Tu Liem Ward, Hanoi
Developer
Mai Linh Investment Joint Stock Company, developed by MIK Group
Status
Phase 1 has been completed and handed over; Phase 2 is underway.
Property types
Apartment, Shop apartment

Overview

The Matrix One is an apartment complex developed by Mai Linh Investment Joint Stock Company and MIK Group.

Phase 1 consists of two 44-story towers with 740 apartments, along with shop apartments and penthouses, and has already been handed over. The facades of these two towers utilize approximately 25,400 m² of Low-E glass. The design firm is Baumschlager Eberle Architekten.

Phase 2, named The Matrix One Premium, comprises two towers: the first 44-story tower and the second 37-story tower, with 975 apartments, designed by Azusa Sekkei of Japan.

Apartments come in various sizes, from studios and one-bedroom units of approximately 41 m² to four-bedroom units of approximately 153 to 165 m². Phase 1 primarily featured two and three-bedroom apartments ranging from approximately 87 to 113 m².

Location

Located at the intersection of Le Quang Dao Extended Road and Me Tri Road, approximately 1 km from My Dinh National Stadium.

Le Quang Dao Extended Road is the main artery connecting the My Dinh area to Thang Long Boulevard.

From July 1st, 2025, the former Me Tri area will be divided into three new wards: Tu Liem, Dai Mo, and Yen Hoa, according to Resolution 1656/NQ-UBTVQH15. Therefore, the administrative address on each property's register should be cross-checked.

Scale

Phase 1: 2 towers, 44 stories high, 740 apartments, 10 apartments per floor, 7 elevators per tower. Phase 2 (The Matrix One Premium): 2 towers, 44 and 37 stories high, 975 apartments.

Legal status

The apartment has a long-term ownership period as announced by the developer; the title deed status should be checked for each individual unit.

Master plan

Phase 1 — two 44-story towers, totaling 740 apartments. Each floor has 10 apartments, and each tower has 7 high-speed elevators. Handover starts in June 2022. Two-bedroom apartments are approximately 86 m², and three-bedroom apartments are approximately 100–113 m².

Phase 2 — The Matrix One Premium — two towers, 44 and 37 stories high, totaling 975 apartments. The podium includes a 4-story shopping mall and 3 floors of shop apartments. Apartment types range from one to four bedrooms, with penthouses and duplexes. Three to four-bedroom apartments are approximately 106–149.6 m².

The project is located within a 40-hectare ecosystem, including the 14-hectare The Matrix Park.

Progress

Phase 1 has been handed over. According to the developer's website, Phase 2 will commence in Q2 2025 and is expected to be handed over in Q3 2027; some other documents state Q2 2027 as the handover date.

Suitable for

Buyers in the high-end segment of My Dinh area, and tenants who are professionals and families, need apartments near the My Dinh sports center.

Amenities

  • Four-season swimming pool
  • Gym and fitness center, spa
  • Movie screening room
  • Japanese garden, jogging path
  • Co-working space
  • Clinic and pharmacy
  • The Matrix One Mall shopping center covers approximately 11,500 m².
  • Opposite a park and lake spanning approximately 14 hectares.

Strengths

  • Phase 1 has been handed over; you can view the actual houses.
  • Located near My Dinh area and the National Stadium.
  • Facing a park and lake of approximately 14 hectares, with unobstructed views.
  • There is a shopping mall right within the complex.
  • Foreign design firm for both phases.

Things to consider

  • The Le Quang Dao and Me Tri areas are crowded and often experience traffic congestion during rush hour and when there are events at My Dinh Stadium.
  • Phase 2 is still underway, and the handover deadlines vary between documents.
  • The administrative address in the register needs to be cross-checked because the old Me Tri area has been divided into two wards.

Machine-translated from the Vietnamese listing.

Homes in this project

No homes listed in this project right now. Contact us — we often have homes before they are listed.

Talk to ALOMYHOME

Call, message us on Zalo or WhatsApp, or send an email — in English or Vietnamese. We will get back to you and arrange a viewing at a time that suits you.

Xem bằng tiếng Việt