The Van Canh New Urban Area, developed by HUD Corporation, is primarily located in Xuan Phuong ward. Its scale is approximately 69.9 hectares according to the 2017 adjustment decision; the project is subject to inspection by the Government Inspectorate starting in July 2025.

Location
Xuan Phuong Ward, Hanoi
Developer
Housing and Urban Development Investment Corporation (HUD)
Status
It has been under construction for many years and is currently under inspection.
Property types
Villa, Townhouse

Overview

The Van Canh New Urban Area, developed by the Housing and Urban Development Investment Corporation (HUD), commenced construction in 2008 in the communes of Van Canh and Di Trach (formerly Hoai Duc district) and Phuong Canh ward (formerly Nam Tu Liem district). The project was temporarily suspended for review as directed by the Prime Minister during the period when Ha Tay was merged into Hanoi. The Ministry of Construction approved the resumption of Phase 1 in July 2010.

The detailed planning was comprehensively adjusted according to Decision 5092/QD-UBND (2017) of the Hanoi People's Committee, increasing the total area to 698,844 m² (~69.9 hectares). From 2019 to the present, many newspapers have reported on the situation of abandoned villas and townhouses, along with construction violations such as adding extra floors and converting them into "mini-apartments" for rent. According to Dan Viet (August 12, 2025), the project is on the list of trillion-VND projects being directly inspected by the Government Inspectorate under Plan 1505/KH-TTCP.

Location

The project spans the area of three former administrative units: Van Canh commune, Di Trach commune (Hoai Duc district), and Phuong Canh ward (Nam Tu Liem district). Following the administrative reorganization effective July 1, 2025 (Resolution 1656/NQ-UBTVQH15), the former Van Canh commune area was divided into two: one part merged into Xuan Phuong ward, and the other into Son Dong commune. According to Dan Viet (August 12, 2025), the main part of the villa/townhouse area is currently recorded as belonging to Xuan Phuong ward — this is based on a news article and has not been directly compared with the document defining the specific land plot boundaries.

Note: This project is different from “An Lac Green Symphony” (original planning name “Van Canh University Urban Area”) — both projects are located in the Van Canh area but are developed by different investors.

Scale

698,844 m² (~69.9 ha) according to Decision 5092/QD-UBND (2017) of the Hanoi People's Committee — the latest data and the most clearly substantiated basis for the decision; older articles (2010–2011) recorded 64.2–68.5 ha because they were pre-adjustment figures.

Legal status

Included in the list of projects to be directly inspected by the Government Inspectorate under Plan 1505/KH-TTCP (July 22, 2025) — a plan for thematic inspection of difficult, problematic, and delayed projects of state-owned enterprises. Numerous violations of construction regulations (extending floors, changing functions) have been repeatedly reported in the press from 2019 to 2025. No inspection conclusions have been published at the time of writing.

Progress

Construction began in 2008, with a comprehensive planning adjustment according to Decision 5092/QD-UBND (2017). A portion is already inhabited; however, according to Dan Viet (August 12, 2025), many construction violations or abandoned buildings still remain.

Suitable for

Suitable for buyers who have thoroughly surveyed the site and prioritize legal aspects from state-owned developers over occupancy rates. Not suitable for those who need a stable living environment immediately or need to generate short-term rental income, as the area still has many construction violations and is under investigation.

Strengths

  • The investor is a state-owned corporation (HUD), and the detailed plan has been approved and adjusted several times by the Hanoi People's Committee, with clear decision-making grounds (Decision 5092/QD-UBND, 2017).
  • Most of the basic infrastructure (internal roads, greenery) was established many years ago; some units are already occupied.

Things to consider

  • From 2019 to 2025, many independent newspapers have reported recurring violations of construction regulations: illegal addition of extra floors, and some buildings being converted into "mini-apartments" for rent with inadequate fire safety systems.
  • The project is on the list of projects to be directly inspected by the Government Inspectorate according to Plan 1505/KH-TTCP (7/2025); no inspection conclusions have been published at the time of compilation.
  • According to Dan Viet (August 12, 2025), by mid-2025 this area will still be in a dilapidated state, with some buildings abandoned for many years.

Machine-translated from the Vietnamese listing.

Homes in this project

No homes listed in this project right now. Contact us — we often have homes before they are listed.

Talk to ALOMYHOME

Call, message us on Zalo or WhatsApp, or send an email — in English or Vietnamese. We will get back to you and arrange a viewing at a time that suits you.

Xem bằng tiếng Việt